PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Scope of work included paving, grading and
drainage design and stormwater permitting with the City of Weston. Potable
water, sanitary sewer and fire department connections were permitted with
Broward County HRS and the City of Weston. The project's overall scope was to
take an existing bank and retrofit the site for a new office building. The
architect was able to retrofit the bank building and add on to the building size
where the bank had drive through tellers lanes. The paving and grading for the
parking included new pavement design, overlay of existing asphalt, and milling
and resurfacing of existing asphalt. Additional drainage structures and
exfiltration was proposed to meet the water quality requirements for the site.
Fire protection was added to the building with appropriate backflow prevention.
Construction was completed in late 2007.
|