Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

Careers

us green building council

ROSS ENGINEERING

A FLORIDA WBE / CDBE / DBE / SBE CORPORATION


               hobe sound national wildlife refuge                   F2 & f3 hydrologic evaluation

Hobe Sound National Wildlife Refuge 

CLIENT:

U.S. FISH & WILDLIFE

HOBE SOUND NATIONAL WILDLIFE REFUGE 

LOCATION:

HOBE SOUND, FLORIDA

ESTIMATED CONSTRUCTION COST:

$500,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

The project involves a hydrologic evaluation for the hydrologic reconnection of the F2 and F3 Lake Francis mosquito control impoundments with the Indian River Lagoon. Using the survey data for impoundments F2 and F3 provided by SES, a limited evaluation of existing impoundment hydrologic exchange capacity was conducted based on impoundment geometry and a simplified representation of tidal dynamics. This hydrologic evaluation was achieved utilizing mathematical calculations, field observations and HYDROLOGIC & HYDRAULIC modeling using icpr.

MAIN OFFICE: 3325 S. UNIVERSITY DRIVE | SUITE 111 | DAVIE, FL 33328 | TEL: (954) 318-0624 | FAX: (954) 358-0190
BRANCH OFFICE: 5190 NW 167 STREET | SUITE 111 | MIAMI, FL 33014 | TEL: (786) 468-8304 | FAX: (305) 620-7787


COPYRIGHT 2008 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED