|
A FLORIDA WBE/ CDBE / DBE / SBE CORPORATION
|
HOLLYWOOD FIRE FIGHTERS LOCAL 1375
CLIENTS:
ARCWERKS, INC.
CITY OF HOLLYWOOD FIRE FIGHTERS
LOCATION:
HOLLYWOOD, FLORIDA
ESTIMATED
CONSTRUCTION COST:
$2,500,000
|
|
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Ross Engineering, Inc. was hired to design the
drainage, water and sanitary sewer for the new union hall. Drainage was designed
with a series of interconnected pipes and exfiltration trench overflowing to a
retention area. Since there was no existing sanitary sewer around this site, a
septic tank was designed to collect the sewer. Permits were obtained through the
City of Hollywood, Broward County EPD, Broward County Engineering, and the
Broward County Health Department.
|
Project Drawing PDF Files
City OF Hollywood Fire Fighters - Paving, Grading and Drainage Drawing
|