|
DEVELOPMENT DENSITY &
COMMUNITY CONNECTIVITY |
USGBC LEED for NEW CONSTRUCTION:
SS Credit 2
Intent
Implementation
Density Development (OPTION 1)
Commercial
-
minimum 60,000 sq.ft. per acre
-
compare to 2 story downtown building
-
previously developed site
Community Connectivity (OPTION 2)
1. previously developed site
2.within 1/2 mile radius of 10 "basic services"
(see below)
-
Banks, churches, restaurants (2 allowed), stores, etc.
-
do not include undeveloped areas (parks, water bodies)
-
pedestrian access between buildings
3. within 1/2 mile of residential area averaging
density 10/units per acre

Illustration of a sample Area Plan
CALL ROSS ENGINEERING TODAY FOR A QUOTE / PROPOSAL
BROWARD (954) 318-0624|
MIAMI (786) 468-8304
|