Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

Careers

 

us green building council

ROSS ENGINEERING

A FLORIDA WBE / CBE / DBE / SBE CORPORATION


STORMWATER DESIGN

QUANTITY CONTROL

USGBC LEED for NEW CONSTRUCTION: SS Credit 6.1

Intent

  • Limit the disruption of natural hydrology

  • Increase on-site filtration

  • Manage storm water runoff

  • Eliminate sources of contaminants

  • Reduce impervious cover

  • Reduce/eliminate pollution

  • Remove pollutants from storm water runoff

Stormwater Design (for reduction of impervious surface)

  • alternative surfaces: rain gardens, vegetated swales, rainwater recycling

  • non-structural surfaces: vegetated roofs, pervious pavement, grid pavers

Implementation

1. case 1: impervious surface less than or equal to 50% of total site area

  • post-development peak discharge rate and quantity equal to or less than pre-development (for 1 and 2 year, 24-hour design storms)

  • implement a stormwater management plan that protect receiving stream channels from excessive erosion by implementing a stream channel protection strategy and quantity control strategies.

2.  case 2: impervious surface more than 50% of total site area

  • post-development peak discharge rate and quantity 25% less than pre-development (from the two-year 24-hour design storm)

 


CALL ROSS ENGINEERING TODAY FOR A  QUOTE / PROPOSAL
BROWARD (954) 318-0624| MIAMI (786) 468-8304


 




MAIN OFFICE: 3325 S. UNIVERSITY DRIVE | SUITE 111 | DAVIE, FL 33328 | TEL: (954) 318-0624 | FAX: (954) 358-0190
BRANCH OFFICE: 5190 NW 167 STREET | SUITE 111 | MIAMI, FL 33328 | TEL: (786) 468-8304 | FAX: (305) 620-7787


COPYRIGHT 2010 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED