Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

Careers

 

us green building council

ROSS ENGINEERING

A FLORIDA WBE / CBE / DBE / SBE CORPORATION


CONSTRUCTION ACTIVITY 

POLLUTION PREVENTION

USGBC LEED for NEW CONSTRUCTION: SS Prerequisite 1

Intent

During construction, there can be a lot of pollution going on, especially when it rains. Pollution on construction sites can be reduced by controlling:

  • Soil Erosion

  • Airborne Dust Generation

  • Waterway Sedimentation

Implementation

  • Provide ESC (Erosion and Sedimentation Control) plan into construction documents and specifications.

  • Goal is to prevent the loss of soil, pollution, and sedimentation.

  • Follow the EPA 2003 (Environmental Protection Agency) standards.

  • CGP (Construction General Permit) outlines how to comply with NPDES program. CGP covers sites greater than 1 acre, but LEED covers all.

Ways to control sedimentation:

  • Stabilization: i.e. seeding and mulching

  • Structural: i.e. silt fences, earth dikes, sediment traps

 

                                Example of structural control. Silt fence: Fabric filter media removes sediment from stormwater volumes flowing through the fence.


CALL ROSS ENGINEERING TODAY FOR A  QUOTE / PROPOSAL
BROWARD (954) 318-0624| MIAMI (786) 468-8304


 




MAIN OFFICE: 3325 S. UNIVERSITY DRIVE | SUITE 111 | DAVIE, FL 33328 | TEL: (954) 318-0624 | FAX: (954) 358-0190
BRANCH OFFICE: 5190 NW 167 STREET | SUITE 111 | MIAMI, FL 33328 | TEL: (786) 468-8304 | FAX: (305) 620-7787


COPYRIGHT 2010 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED