MDX C-4 BLUE LAGOON XP-SWMM ANALYSIS
CLIENTS:
Miami-Dade County Expressway Authority (MDX)
HNTB (General Consultant to MDX)
APCTE (Drainage Sub-Consultant to HNTB)
LOCATION:
MIAMI-DADE COUNTY, FLORIDA
ESTIMATED
PROJECT CONSTRUCTION COST:
$10,000,000
|
|
PROJECT DESCRIPTION / SCOPE OF WORK:
Performed XP-SWMM flood control modeling and
created a volumetric analysis report utilizing Miami-Dade County Department of
Environmental Resource Management (DERM) C-4 existing and future conditions models for the 5, 10, 25, 50 and
100 year storm events. Widening of the 836 off-ramp close to Miami-Dade
International Airport (MIA) requires the Miami-Dade County Expressway Authority
(MDX) to propose filling in a portion of the adjacent Blue Lagoon. A total
of four scenarios were analyzed including (1) Current conditions as it is today
(2) MDX filling in 6 Acres within their right-of-way (3) MDX filling in all of
their right-of-way, or roughly 25 Acres, and finally (4) a cumulative scenario
of all properties who have fill rights including MDX to fill in the lagoon
within their property boundaries as requested by Carlos DeRojas, P.E. and
Eduardo Lopez, P.E. who work with SFWMD Surface Water Regulation Department in
West Palm Beach, FL. A comparison of hydrographs and tabular results was
reported for all 40 XP-SWMM model runs and a final conclusion of a negligible
flood stage impact to the C-4 Basin's critical nodes was provided. Some critical
nodes examined include the Cities of Sweetwater and Doral located just west of
Miami, Florida.
|