|
mastec lift station

CLIENT:
A-1 UNDERGROUND
LOCATION:
DAVIE, FLORIDA
ESTIMATED
CONSTRUCTION COST:
$500,000
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Designed and permitted the lift station, and utility design for this
mastec lift station project.
Utility design included a sanitary sewer plan & Profile. lift station design
included a lift station plan, lift station details and calculations.
|