|
PROJECT DESCRIPTION / SCOPE OF WORK:
Performed XP-SWMM flood control modeling and
created a volumetric analysis report utilizing Miami-Dade County Department of
Environmental Resource Management (DERM) C-8 existing and future conditions models for the 5, 10, 25, 50 and
100 year storm events. Proposed lake in-fill in the Opa Locka are of
Miami-Dade County. A total
of four scenarios were analyzed including (1) Current conditions as it is today
(2) filling in 25 Acres within their right-of-way and (3) a cumulative scenario
of all properties who have fill rights including the Netherton Greens property to fill in the lake
within their property boundaries as requested by Carlos DeRojas, P.E. and
Eduardo Lopez, P.E. who work with SFWMD Surface Water Regulation Department in
West Palm Beach, FL. A comparison of hydrographs and tabular results was
reported for all 30 XP-SWMM model runs and a final conclusion of a negligible
flood stage impact to the C-8 Basin's critical nodes was provided. Some critical
nodes examined include the Opa Locka and Miami Gardens.
|