Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

Careers

us green building council

ROSS ENGINEERING

A FLORIDA WBE/ CDBE / DBE / SBE CORPORATION


Netherton Greens C-8 Volumetric Modeling Analysis

CLIENT:

miller legg Miller Legg and Associates

LOCATION:

OPA LOCKA, FLORIDA

ESTIMATED PROJECT CONSTRUCTION COST:

$10,000,000

PROJECT DESCRIPTION / SCOPE OF WORK:

Performed XP-SWMM flood control modeling and created a volumetric analysis report utilizing Miami-Dade County Department of Environmental Resource Management (DERM) C-8 existing and future conditions models for the 5, 10, 25, 50 and 100 year storm events.  Proposed lake in-fill in the Opa Locka are of Miami-Dade County.  A total of four scenarios were analyzed including (1) Current conditions as it is today (2) filling in 25 Acres within their right-of-way and (3) a cumulative scenario of all properties who have fill rights including the Netherton Greens property to fill in the lake within their property boundaries as requested by Carlos DeRojas, P.E. and Eduardo Lopez, P.E. who work with SFWMD Surface Water Regulation Department in West Palm Beach, FL.  A comparison of hydrographs and tabular results was reported for all 30 XP-SWMM model runs and a final conclusion of a negligible flood stage impact to the C-8 Basin's critical nodes was provided. Some critical nodes examined include the Opa Locka and Miami Gardens.

Project Drawing PDF Files

Netherton Greens C-8 Lake XP-SWMM Volumetric Analysis Map

MAIN OFFICE: 3325 S. UNIVERSITY DRIVE | SUITE 111 | DAVIE, FL 33328 | TEL: (954) 318-0624 | FAX: (954) 358-0190
BRANCH OFFICE: 5190 NW 167 STREET | SUITE 111 | MIAMI, FL 33014 | TEL: (786) 468-8304 | FAX: (305) 620-7787


COPYRIGHT 2008 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED