ORANGEMEN WAREHOUSE FACILITY
CLIENT:
ORANGEMEN DEVELOPMENT AND CONSTRUCTION
LOCATION:
DAVIE, FLORIDA
ESTIMATED CONSTRUCTION COST:
$3,000,000
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Scope of work included the paving, grading
and drainage design and stormwater permitting with Town of Davie, Central
Broward Water Control District (CBWCD) and South Florida Water Management
District (SFWMD). Potable water, sanitary sewer and fire department connections
designed and permitted with Broward County HRS and the Town of Davie Utilities
and Engineering departments. Orangemen Warehouse is the last undeveloped 3 acre
parcel of land located within the New Town Master Plan. The project required dry
pre-treatment of water quality to over flow inverted weirs that ultimately make
it to the Master Plan's large ponds. Other improvements included new sidewalk
along Kean Road right-of-way and entrance enhancements to meet the Master Plan's
25 year berm elevation as per CBWCD.
|