Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

Careers

 

ROSS ENGINEERING

A FLORIDA WBE / CBE / DBE / SBE CORPORATION


SFWMD S-124 Gated Culvert Replacement Project

CLIENTS:

     Arcadis

    South  Florida Water Management District

LOCATION:

     Sunrise, Florida

ESTIMATED CONSTRUCTION COST:

     $3,000,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

Ross Engineering provided civil engineering services on an existing South Florida Water Management S-124 Culvert Replacement Project in the city of Sunrise, Florida. The replacement of the existing S-124 structure has the new structure proposed approximately 150 feet north of the existing structure. With this new proposed location, the road was extended north on both sides of the canal. The road is proposed with a 12 inch compacted sub-base and 12 inches of compacted limestone. A general permit has been identified by the Broward County EPD which requires water quality treatment to be applied to the limits of construction, excluding the canal right-of-way.

Project Drawing PDF Files

S-124 Culvert Replacement Paving, Grading & Drainage

MAIN OFFICE: 3325 S. UNIVERSITY DRIVE | SUITE 111 | DAVIE, FL 33328 | TEL: (954) 318-0624 | FAX: (954) 358-0190
BRANCH OFFICE: 5190 NW 167 STREET | SUITE 111 | MIAMI, FL 33328 | TEL: (786) 468-8304 | FAX: (305) 620-7787


COPYRIGHT 2008 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED