|
SEMINOLE BRIGHTON RESERVATION PUBLIC SAFETY

CLIENTS:
SEMINOLE TRIBE OF FLORIDA
GULF DESIGN / GULF BUILDING CORP.
LOCATION:
BRIGHTON RESERVATION, FLORIDA
ESTIMATED
CONSTRUCTION COST:
$8,000,000
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Scope of Work included paving, grading &
drainage, and utility design for this Seminole Indian Reservation project.
Utility design included tying into an existing lift station and a capacity
analysis was performed for the station. Stormwater design included onsite
retention coupled with a control structure with discharge to an adjacent ditch
was provided for adequate flood control and water quality for the Public Safety
complex.
|