Home

Services

Projects

Clients

Certifications

About Us

Contact Us

Site Map

ROSS ENGINEERING

A FLORIDA WBE / CDBE / DBE / SBE CORPORATION


SEMINOLE BRIGHTON RESERVATION PUBLIC SAFETY

CLIENTS:

SEMINOLE TRIBE OF FLORIDA

GULF DESIGN / GULF BUILDING CORP.

LOCATION:

BRIGHTON RESERVATION, FLORIDA

ESTIMATED CONSTRUCTION COST:

$8,000,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

Scope of Work included paving, grading & drainage, and utility design for this Seminole Indian Reservation project. Utility design included tying into an existing lift station and a capacity analysis was performed for the station. Stormwater design included onsite retention coupled with a control structure with discharge to an adjacent ditch was provided for adequate flood control and water quality for the Public Safety complex.

 

Project Drawing PDF Files

Seminole Indian Brighton Public Safety Complex - Paving, Grading and Drainage Drawing


COPYRIGHT 2008 ROSS ENGINEERING, INC. ALL RIGHTS RESERVED