|
PROJECT DESCRIPTION / SCOPE OF WORK:
PROVIDED A COMPREHENSIVE DRAINAGE ANALYSIS
UTILIZING EXISTING PERMIT INFORMATION AND A RECENT TOPOGRAPHICAL SURVEY. this
ANALYSIS INCLUDED PROVIDING THE EXISTING LAND USE, SOIL STORAGE, STAGE-STORAGE,
RAINFALL, HYDRAULIC CONNECTIONS FOR THE carwash, OIL CHANGE FACILITY, TIRE
KINGDOM AND THE JAMBCO MILLWORK SITES. the NUMERICAL MODEL WE SELECTED TO HELP
US WITH THIS ANALYSIS IS THE ICPR MODEL CREATED BY STREAMLINE TECHNOLOGIES.

|