NEIGHBORHOOD DRAINAGE IMPROVEMENTS FOR CITY OF NORTH MIAMI BASIN 5

CLIENTS: PALM ENGINEERING GROUP
CITY OF NORTH MIAMI

LOCATION: NORTH MIAMI, FLORIDA

ESTIMATED CIVIL CONSTRUCTION COST: $2,500,000

PROJECT DESCRIPTION / SCOPE OF WORK:

Neighborhood drainage improvements to improve water quality and flood control for 7 problem streets within the City of North Miami’s Basin 5
(source: City of North Miami Stormwater Master Plan). Our scope of work includes best management practices for
water quality and flood mitigation for the flooding areas. The analysis, design and permitting
of the two drainage wells on NE 14th avenue and a storm water pump station using Flyght pumps with a 7.5 HP
pump and 200 LF force main on NE 136th street. Palm Engineering (Prime Consultant) was responsible for the
project management and oversight of the design team.