Miami-Dade Water and Sewer Department · Miami-Dade County, Florida · 2024 to present

Small Water Main Replacement Program (R-26)

Ross Engineering is the prime consultant on the Miami-Dade Water and Sewer Department's Small Diameter Contract for the Small Water Main Replacement Program, Atlas R26 (PCTS 16297). The work upgrades aging and undersized potable water mains so the neighborhood's water distribution system meets current codes and design standards for pressure, reliability and fire protection.

Water main assessment and base of design memorandum

Ross Engineering first evaluated one square mile of the R26 atlas area and used GIS to find water mains smaller than 8 inches. The analysis flagged aging pipelines, mains with frequent leaks and repairs, undersized pipes, and mains with limited access in alleys and easements. The technical memorandum recommended upsizing:

  • Mains smaller than 6 inches in residential areas to 8 inches
  • 12-inch mains for commercial, industrial and high-density residential areas and half-section line roads
  • 16-inch mains along full-section line roads

A fire flow analysis confirmed accurate pipe sizing and fire hydrant spacing.

Design of more than 45,000 linear feet of new water main

Miami-Dade approved the design of the water main replacement for one half of the evaluated square mile. Melissa R. Ross is the project manager for the design of more than 45,000 linear feet of water main. The design is currently in the 30 percent phase and follows the layout set out in the memorandum, coordinated with the Department's water modeling group.

  • 6-inch mains are abandoned in place and replaced with new 8-inch ductile iron water main in residential areas
  • Mains in commercial, industrial and high-density residential areas are replaced with 12-inch water main, and section line roads are upsized to 16-inch
  • Undersized mains on streets with fire flow deficiencies are upsized to meet code
  • Water meters in rear easements are relocated to the front of the property and connected to the new mains
  • Existing fire hydrants are reconnected and new hydrants are added to meet spacing requirements approved by the Miami-Dade County Fire Department
  • Mains are looped wherever possible, with blow-off valves or added hydrants at the 13 dead-end connections

Ross Engineering's civil engineering scope

  • Water system assessment and GIS utility analysis
  • Water main upsizing design
  • Fire flow and hydrant analysis
  • Distribution system modeling coordination
  • Service and meter relocations
  • Valves, hydrants and main looping
  • Construction document development

Project facts

  • Owner: Miami-Dade Water and Sewer Department
  • Ross Engineering's role: Prime consultant
  • Location: Atlas R26, Miami-Dade County, Florida
  • Performance period: 2024 to present
  • Construction: 2026 to 2028