SEMINOLE BIG CYPRESS RESERVATION PUBLIC SAFETY DRAINAGE

CLIENTS: SEMINOLE TRIBE OF FLORIDA
GULF DESIGN / GULF BUILDING CORP.

LOCATION: BIG CYPRESS RESERVATION – CLEWISTON, FLORIDA

ESTIMATED CONSTRUCTION COST: $9,000,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

Contracted by Gulf Design Group to design paving, grading, drainage, and utilities for this Seminole Indian Reservation project. Utility design included a 5 horsepower duplex lift station designed to pump into an existing force main under peak flow conditions. Stormwater design included aN XP-SWMM NUMERICAL model to provide adequate flood control and water quality for the Public Safety complex, an adjacent church, the west portion of the airport runway, and the frontage road for the airport.

Project Drawing PDF Files

Seminole Indian Big Cypress Public Safety Complex – PGD / Offsite Retention Drawing

Seminole Indian Big Cypress Public Safety Complex – Liftstation Detail Drawing